We delivered a high‑bay steel factory for a flooring producer in Thailand. The pre‑engineered system achieves long clear spans, fast erection, and a low‑maintenance envelope.
A crisp silver façade with ribbed panels presents a modern brand image. Dark plinth panels protect high‑wear areas and simplify future cleaning and repainting.
The client needed a reliable, expandable plant with efficient airflow and daylight. Monsoon weather, high humidity and tight timelines were key constraints.
Our solution pairs robust frames with corrosion‑resistant finishes and rapid installation. Modular bays allow phased expansion without interrupting production.
Heavy H‑section columns and rafters form multi‑span portals with braced bays for stability. Galvanized Z‑purlins and C‑girts support roof and wall cladding with minimal deflection.
Integrated steel platforms and bright yellow staircases provide safe access to equipment levels. The structure is crane‑ready, with reserved connection points for future material‑handling rails.
Ribbed metal wall panels and insulated roof sheeting deliver thermal performance and acoustic control. Continuous skylight strips bring uniform daylight to the production floor.
High‑level louvres and vent bands promote natural cross‑ventilation. Glazing at worker height improves visibility and safety along the production lines.
Primary members are factory‑blasted, zinc‑rich primed and finished with polyurethane coats. Galvanized secondary steel and stainless fasteners resist corrosion in humid, coastal conditions.
Deep gutters, protected downpipes and robust flashing details manage monsoon rain. All exterior sealants and gaskets are specified for UV and heat exposure.
We used fall‑arrest nets, boom lifts and certified rigging throughout erection. Welds follow WPS/PQR procedures, with NDT on critical joints and torque‑logged bolts.
Every member is numbered, check‑assembled and recorded in our ITP for full traceability. This reduces site rework and keeps the programme predictable.
Steel was packaged by erection sequence for quick lifting with mobile cranes. Local crews received a marked set‑out and digital shop drawings for smooth assembly.
The shell and core were closed in rapidly, allowing early MEP and line installation. This fast‑track approach brought the plant online ahead of the seasonal peak.
The new steel facility presents a professional face to clients and inspectors. It is reliable, safe and easy to expand—built for Thailand’s climate and for sustained 24/7 production.
Planning a steel structure factory in Thailand or Southeast Asia? Contact our engineering team for budget options, schedules and a dependable delivery plan.